OSTİM Organized Industrial Zone Logo

Participation in the EACP Working Group Meeting was ensured.

Participation in the EACP Working Group Meeting was ensured.
Oluşturulma Tarihi: 19.08.2025
/
Güncellenme Tarihi: 19.08.2025
/
Kategoriler:

Participation was ensured in the EACP Working Group Supply Chain and Technology online meeting. Information was received about the ongoing projects.

Görseller